Location
Cold Lake, Alberta
Owner/Client
City Of Cold Lake
Architect/Designer
BR2 Architecture
Completion
2018
Photos by
Concept Engineering
Role
Electrical Consulting
At a completed cost of $30million, the Cold Lake Energy Center received a second arena, 360 degree climbing wall, mini stick play surface with significant expansion to the concourse area adding additional conference and multi-purpose rooms. An outdoor artificial turf field complete with grand stands, dressing rooms and concession was also added.
Share This Project: